CASE STUDY /

Project NEO

Fit Out

Overview:

We delivered the full fit out of a new temperature-controlled warehouse facility in the South West for a leading UK ready meal manufacturer.

Feasibility

Detailed Design

Construction

Commissioning

The Challenge:

The project required the creation of a high-performance, future-ready environment incorporating chilled, frozen and ambient zones, all designed to enhance operational efficiency and support the client’s long-term growth. Working closely with the client team, we needed to ensure full compliance with industry standards while building in scalability for evolving production demands.

From early discovery and design through to construction and commissioning, the challenge centred on transforming a new build warehouse into a fully integrated, technical food manufacturing asset. Delivered over 45 weeks with a value of £17.1 million, the scheme demanded precise coordination to meet the stringent requirements of a high-value, temperature-controlled fit out.

Location:

Avonmouth

Duration:

45 weeks

Size:

105,000 sqft

Value:

£17,100,000

The Outcome:

Delivery of a high-performance multi-chamber temperature-controlled warehouse facility ready for the demands of tomorrow.